OEE Work Sheet
Topic
Total Productive Maintenance (TPM)
Summary
Assists in the understanding of the dynamics of Overall Equipment Effectiveness (OEE) and provides clarity to the equation of OEE. This is intended to help us develop our current state and increase the overall percentage with the use of our TPM program.
Objective
Help employees understand OEE and the impact it has as a tool for increasing machine availability, quality, and performance.
Summary of Steps
- Fill in essential fields at the top
- Group
- Equipment addressed
- Date
- Revision (if applicable)
- Equipment time illustration
- Shows total operating time reduced to valuable operating time
- Losses broken down into 6 major types of equipment losses
- Equations relating to the 6 losses are defined
- Input your figures and calculate:
- A – Availability
- True time available for production
- P – Performance rate
- Actual production against your standard production rate
- Q – Quality rate
- Amount of acceptable parts as a percentage of total production
- A – Availability
- Calculate total OEE percentage